DuPage County Centralized Traffic Signal Control

Description

Hardware, software and communications infrastructure needed to centrally manage DuPage County signals. This will initially provide a centralized signal and CCTV management system for 100 intersections in northern DuPage County. Full build out will include 900 signals throughout the county with interfaces to incident, fleet, transit, law enforcement and to Aurora and Naperville TMCs. There are currently 84 signals included in this project. Expansion is ongoing.

Currently, the project is substantially completed with approximately 425 signals accessible inclusive of signals from IDOT(9), Aurora (12), Naperville (40), Downers Grove (14), and Lombard (33). IDOT's pursuit of their own ATMS system will generally defer those IDOT systems as being added to their own ATMS or to Dupage ATMS to IDOT's preference. DuDOT ATMS is expanding video feed access to law enforcement. Incident and fleet management are not current or planned features of the ATMS but may support those tasks indirectly.

Status: Existing

Timeframe: Short

Stakeholders

City of Aurora
City of Naperville
DuPage County Division of Transportation
Illinois Dept of Transportation District 1 Bureau of Traffic Operations
Municipalities/Townships

Inventory

DuPage County Centralized Signal Management System
DuPage County Communications Infrastructure
DuPage County Field Equipment
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipment
Municipal/Township Communications Infrastructure
Municipal/Township Field Equipment

Services

TM03–Traffic Signal Control (Instance 1)
TM07–Regional Traffic Management

Interfaces

SourceFlowDestinationStatus
DuPage County Centralized Signal Management Systemsignal control commandsDuPage County Field EquipmentPlanned
DuPage County Centralized Signal Management Systemsignal control device configurationDuPage County Field EquipmentPlanned
DuPage County Centralized Signal Management Systemsignal control plansDuPage County Field EquipmentPlanned
DuPage County Centralized Signal Management Systemsignal system configurationDuPage County Field EquipmentPlanned
DuPage County Centralized Signal Management Systemtraffic detector controlDuPage County Field EquipmentPlanned
DuPage County Centralized Signal Management Systemvideo surveillance controlDuPage County Field EquipmentPlanned
DuPage County Field Equipmentbarrier system coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
DuPage County Field Equipmentdynamic sign coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
DuPage County Field Equipmentdynamic sign coordinationMunicipal/Township Field EquipmentExisting
DuPage County Field Equipmentpassive vehicle monitoring coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
DuPage County Field Equipmentright–of–way request coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
DuPage County Field Equipmentright–of–way request coordinationMunicipal/Township Field EquipmentExisting
DuPage County Field Equipmentright–of–way request notificationDuPage County Centralized Signal Management SystemPlanned
DuPage County Field Equipmentsignal control coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
DuPage County Field Equipmentsignal control coordinationMunicipal/Township Field EquipmentExisting
DuPage County Field Equipmentsignal control statusDuPage County Centralized Signal Management SystemPlanned
DuPage County Field Equipmentsignal fault dataDuPage County Centralized Signal Management SystemPlanned
DuPage County Field Equipmenttraffic detector coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
DuPage County Field Equipmenttraffic detector coordinationMunicipal/Township Field EquipmentExisting
DuPage County Field Equipmenttraffic detector dataDuPage County Centralized Signal Management SystemPlanned
DuPage County Field Equipmenttraffic imagesDuPage County Centralized Signal Management SystemPlanned
DuPage County Field Equipmenttraffic metering coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
DuPage County Field Equipmenttraffic metering coordinationMunicipal/Township Field EquipmentExisting
DuPage County Field Equipmentvideo surveillance coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
DuPage County Field Equipmentvideo surveillance coordinationMunicipal/Township Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentbarrier system coordinationDuPage County Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentbarrier system coordinationMunicipal/Township Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentdynamic sign coordinationDuPage County Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentdynamic sign coordinationMunicipal/Township Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentpassive vehicle monitoring coordinationDuPage County Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentpassive vehicle monitoring coordinationMunicipal/Township Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentright–of–way request coordinationDuPage County Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentright–of–way request coordinationMunicipal/Township Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentright–of–way request notificationIDOT District 1 Bureau of Traffic – Arterial Signal OperationsExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentsignal control coordinationDuPage County Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentsignal control coordinationMunicipal/Township Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentsignal control statusIDOT District 1 Bureau of Traffic – Arterial Signal OperationsExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentsignal fault dataIDOT District 1 Bureau of Traffic – Arterial Signal OperationsExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmenttraffic detector coordinationDuPage County Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmenttraffic detector coordinationMunicipal/Township Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmenttraffic detector dataIDOT District 1 Bureau of Traffic – Arterial Signal OperationsExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmenttraffic imagesIDOT District 1 Bureau of Traffic – Arterial Signal OperationsExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmenttraffic metering coordinationDuPage County Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentvideo surveillance coordinationDuPage County Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Operations Field Equipmentvideo surveillance coordinationMunicipal/Township Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Signal Operationssignal control commandsIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Signal Operationssignal control device configurationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Signal Operationssignal control plansIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Signal Operationssignal system configurationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Signal Operationstraffic detector controlIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
IDOT District 1 Bureau of Traffic – Arterial Signal Operationsvideo surveillance controlIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
Municipal/Township Field Equipmentbarrier system coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
Municipal/Township Field Equipmentdynamic sign coordinationDuPage County Field EquipmentExisting
Municipal/Township Field Equipmentdynamic sign coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
Municipal/Township Field Equipmentpassive vehicle monitoring coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
Municipal/Township Field Equipmentright–of–way request coordinationDuPage County Field EquipmentExisting
Municipal/Township Field Equipmentright–of–way request coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
Municipal/Township Field Equipmentsignal control coordinationDuPage County Field EquipmentExisting
Municipal/Township Field Equipmentsignal control coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
Municipal/Township Field Equipmenttraffic detector coordinationDuPage County Field EquipmentExisting
Municipal/Township Field Equipmenttraffic detector coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting
Municipal/Township Field Equipmenttraffic metering coordinationDuPage County Field EquipmentExisting
Municipal/Township Field Equipmentvideo surveillance coordinationDuPage County Field EquipmentExisting
Municipal/Township Field Equipmentvideo surveillance coordinationIDOT District 1 Bureau of Traffic – Arterial Operations Field EquipmentExisting